Hi All,
Compatible XR frames for 1‑Phase Smart UPS models are automatically recommended based on the selected UPS and battery configuration once both are added to the design. A contextual notification prompting the user to add the appropriate compatible XR frame to ensure proper installation and support.
Thanks
LEC Team